Not only do we need to focus on the implication and application of BIM level 2, but we need to look further to the horizon where BIM Level 3 is being developed.
Smart Metering Solutions and Energy Analytics: The Strand Case Study
Cube Controls has delivered one of its most comprehensive smart metering solutions at One The Strand in London. The project replaced decades-old manual meters with a wireless, Measuring Instruments...


